Production and technical department in construction. Professional development

Duration 2 days

The seminar can be held online on the official International Business Academy platform. On completion of the training you will be given a link to the recording, which will be available for one month.
*dates are subject to additional confirmation

Seminar dates

Schedule: 10:00 to 17:30
Cost 296 500 tenge

excluding VAT

* VAT of 16% will be added to the invoice

The price includes:

  • Seminar
  • Exclusive handout materials
  • IBA certificates
  • Notepads, pens
  • Lunches and 2 coffee breaks
Register

The changes in Legislation and technical regulation of the construction industry current for 2022 are aimed entirely at achieving maximum quality of construction services and the final construction product, and hence the best financial result from implementing construction, reconstruction, capital and current repair projects in the housing and civil, infrastructure, industrial and sector segments of the economy. In these conditions the Production and Technical Department (PTD) is the key link.

This seminar is intended for all interested parties, managers, performers, specialists of all services and units, and all participants in implementing construction, reconstruction, modernisation, capital and current repair projects in the housing and civil and infrastructure segments of the economy.

  • Within the course answers will be given to all your production questions related to the course topic, along with recommendations on organising and carrying out measures to increase production efficiency
  • Participants are given the opportunity to use free online consultations on the course topics
  • All methodological and legislative material on the course topics will be provided in electronic form in full

Key Account Manager

Natalya Batukhtina
ns@iba.kz +7 702 777 44 11 WhatsApp

Key Account Manager

Юлия Копцева
manager@iba.kz +7 702 777 44 11 WhatsApp
Seminar programme Download programme as PDF
Get a personalised commercial proposal in PDF format
Download proposal as PDF

Programme

  1. Current changes in the Legislation of the Republic of Kazakhstan in construction, reconstruction, modernisation, capital and current repair in the industrial and sector, housing and civil and infrastructure segments of the economy
  2. Stages of implementing construction projects. The role of the PTD and its specialists at each stage
  3. State standards, latest changes and new editions. Process flow charts
  4. Organising the PTD's work. Goals and objectives of the PTD of the Customer, General Contractor, Contractor and Subcontractor on construction, reconstruction, modernisation, capital and current repair projects in the industrial and sector, housing and civil and infrastructure segments of the economy. Specifics of external and internal utility networks
  5. Regulations on the PTD. Job descriptions. Procedures. Process flow charts
  6. Technical documentation in the PTD. Mandatory technical documentation and internal documents of the PTD. The PTD's interaction with all services and units of the enterprise — the key factor in successful project implementation
  7. Design and estimate documentation at the «Detailed Design» stage. Structure of the design and estimate documentation. Specifics of each Section of the Detailed Design. Working with drawings. Specifics of drawings for external and internal utility networks. The construction organisation plan. The work execution plan. Recommendations on specialist reference literature
  8. As-built documentation. Production reports. Work logs, induction briefing logs, welding logs, as-built drawings, test reports and laboratory conclusions. Certificates of inspection of concealed work, Certificates of completed construction and installation work. Substitution certificates. Documenting additional construction and installation work. Recommendations on specialist reference literature
  9. Software products of the PTD. ABC-4.2021. Maximum capabilities of ABC.2021 for the PTD:
    • Production reports (Form 2V, Resource consumption report — write-off of materials including Form M29-2, Certificate of completed construction and installation work KS-3)
    • Developing work schedules
    • Project management
    • Monitoring production processes
  10. The PTD's task of determining the dumping threshold for participation in procurement taking into account the enterprise's production capabilities. Identifying savings reserves based on the contractor enterprise's production capabilities
  11. Monitoring production processes in the PTD. Main controlled parameters for achieving the target financial result within the set deadlines
  12. The work schedule. Determining construction timelines. Calculating contract performance deadlines based on the customer's requirements and the contractor's capabilities
  13. Interaction of the PTD and its specialists with Technical Supervision, designer's supervision and the quality control service
  14. Additional construction and installation and repair and construction work. Documenting additional work. Substitution certificates. The defect list. The defect certificate, the Bill of quantities
  15. Write-off of materials — an important tool for controlling quality and production efficiency
  16. Methodological and reference literature in construction. Recommendations on further self-education and professional development in construction technology, organisation of construction production and production reporting
  17. Brief overview of upcoming changes in construction in the near future in the industrial and sector segment, as well as housing and civil construction
  18. Overview of world practice in solving the current issues of the seminar
  19. Consideration of seminar participants' current production questions
  20. Answers to questions

All areas