Construction materials. Supply in construction

Duration 2 days

The seminar can be held online on the official International Business Academy platform. On completion of the training you will be given a link to the recording, which will be available for one month.
*dates are subject to additional confirmation

Seminar dates

Schedule: 10:00 to 17:30
Cost 296 500 tenge

excluding VAT

* VAT of 16% will be added to the invoice

The price includes:

  • Seminar
  • Exclusive handout materials
  • IBA certificates
  • Notepads, pens
  • Lunches and 2 coffee breaks
Register

This seminar is designed for a wide range of specialists from all services and units connected in one way or another with the production of construction materials and equipment, their supply to consumers and their use in construction production, reconstruction, capital and current repair. It will undoubtedly also be useful to all specialists involved in forming a project budget, determining its profitability, and preparing the enterprise to take part in a procurement Tender for construction, reconstruction, capital and current repair services in both budget-funded and commercial projects.

We will examine the method of analysing the cost of construction materials, the financial analysis of estimate documentation by cost of materials and equipment; identifying the key factors affecting cost; determining resource cost limits; making strategic decisions on implementing a project with a target financial result.

At the seminar we will consider at least 30 strategic decisions for reducing project cost without harming construction technology or the quality of construction production, through the right strategy for selecting construction materials and suppliers.

Key Account Manager

Natalya Batukhtina
ns@iba.kz +7 702 777 44 11 WhatsApp

Key Account Manager

Юлия Копцева
manager@iba.kz +7 702 777 44 11 WhatsApp
Seminar programme Download programme as PDF
Get a personalised commercial proposal in PDF format
Download proposal as PDF

Programme

Day 1
  1. The Basic Law of entrepreneurial activity. Defining the goal of entrepreneurial activity. Production of construction materials, their sale, construction, reconstruction, capital and current repair — as types of entrepreneurial activity. Current tasks in 2024.
  2. The Law on Public Procurement — requirements for preparing the Technical and Economic part of the Tender Documentation in budget-funded and quasi-budget projects. Commercial tenders. Changes to the Law on Public Procurement. The role of the cost of construction materials in forming tender proposals.
  3. The state standard for determining construction cost in the Republic of Kazakhstan. Main provisions for determining the estimated cost of construction. The share of the cost of construction materials and equipment in the total project cost.
  4. Construction materials — the main resource of construction production. Pricing principles in construction.
  5. The state standard on monitoring the cost of construction materials, quarterly changes in unit rates in the Republic's estimate standards base for all regions.
  6. Structure of design and estimate documentation. The variety of construction materials, the specifics of applying construction materials for each section of the Detailed Design. Specifics of accounting for construction materials and equipment in the Terms of Reference, in design decisions and in construction production.
  7. Classification of construction materials and their specifics. The materials consumption report, their write-off in construction, reconstruction, capital and current repair.
  8. Consumption rates for construction materials, sources of information for determining consumption rates of construction materials and their required quantity. Write-off of construction materials. Form M29-2. Write-off of materials in accounting and construction quality control.
  9. The resource estimate. The materials write-off list. The role of the procurement and logistics service in forming the profitability of construction production.
  10. Non-resource-base construction materials, structures and equipment. Method for entering such materials into cost estimates. Legal and financial documents confirming the cost of non-resource-base construction materials and equipment. Mandatory delivery terms for materials and equipment for budget-funded and quasi-budget projects. Possible options for delivery terms of construction materials for commercial projects.
Day 2
  1. The international Incoterms system in 2024. Delivery terms. Supplier's and buyer's responsibility for insurance, quality, delivery and other expenses.
  2. Forming recommended material cost limits (maximum and minimum discount). Determining project profitability under reduced costs of construction materials and equipment, and hence of the construction, reconstruction, capital and current repair project as a whole, for participation in a Tender.
  3. Quality control of construction materials. Measures and procedures of incoming inspection in construction production, reconstruction, capital and current repair. Identifying the key factors affecting project cost.
  4. The construction materials delivery schedule, monitoring the production and financial situation, working with suppliers.
  5. Analysis of world practice in the production of construction materials and their use in construction, reconstruction, capital and current repair.
  6. Modern technologies, innovative construction materials. Classic general construction and finishing materials, specific materials for utility networks.
  7. Modern requirements for construction materials and equipment. Global trends in the development of the construction materials industry.
  8. International quality management standards in the production of construction materials, logistics structures and construction production.
  9. Modern structures and logistics schemes for the supply of construction materials.
  10. Answers to questions.

All areas